Call us +358505925130 or info@wildandfree.gr

Specifications

SPECIFICATIONS

THE PREFABRICATED HOUSES fulfill ALL ISCHYSES IN EUROPEAN UNION LEGISLATION AND STANDARDS FOR ALL THE STUDIES

ARCHITECTURE (GOK'85 N.1577 / 85, as amended and supplemented by the N.1647 / 86, N.1772 / 88, L.1892 / 90, the KTIRIODOMIKO REGULATION Gazette 59D '/ 3,2,89.)
STATISTICAL AND EARTHQUAKE (NEAK, EUROCODE 5 EUROCODE 1 EUROCODE 8 DIN 1052, DIN1055.)
FIRE PROTECTION (REGULATION FOR FIRE PROTECTION OF BUILDINGS P.D.71 / 88)
INSULATION (Gov. 362D '/ 4,7,79 REGULATION FOR THERMAL BUILDINGS)
BUILDING PERMIT (from the competent Urban Planning Agencies)
The procedures followed before the construction of prefabricated houses are:

COMPLETENESS OF LAND The documents needed are:


1.Τopographical map indexed in duplicate and signed by the engineer.

2.Οwnership certificate of the land.

3.Contract and a certificate of ownership

4.Fees - Tax reservations - Fiscal control

APPROVAL AND DISCLOSURE OF PREFABRICATED HOUSES

The decision prefabricated residential type approval is necessary for the building permit from the competent services Urban prefectural governments and municipalities, according to existing legal requirements and obtaining the opinion of the competent Local Architectural Committees (National Football). Generally, this approval is for prokaskefasmena houses optional. This offering is that it guarantees the authorship of prefabrication system, while also significantly simplifies and facilitates the building permit process, it indicated that preceded all the controls of the individual studies.

BUILDING PERMIT
The building permit building or installation is considered to include the terrain, the necessary excavations for the foundations of the building or the installation and construction Palisades, cesspools and underground water tanks. More specifically, the process to issue the building permit of a prefabricated construction coincides with what apply to conventional. Responsible for granting the building permit is the Town Planning Service in which the property belongs. These documents are summarized as follows:

1) Application in which they are integrated into a single issue forms with statements assignments - Commitment, checklist.

2) Specific budget form.

3) Topographic diagram and chart coverage.

4) Architectural Design.

5) Structural design and various other approvals, depending on the use, the surface and the region.

6) Study of passive fire protection.

7) Proof of submission of the consultant engineer's fee.

8) Reasoned report by the consultant engineer.

9) Study of thermal insulation.

10) Studies plumbing and sewage, electrical installations, active fire protection, gas stations, where necessary, in accordance with the standards and regulations.

11) Property and recent certificate of ownership title for each plot - golf, even in derogation or off plan.

12) Notarized statement garage or proof of payment of the required contribution.

The average of the process throughput time is two months, and the cost varies depending on the case, depending on the surface, the use and the region.

STUDIES
Each project requires a series of studies in two copies, as follows:

o Structural design.

o Study of thermal insulation.

o Land technical research where necessary.

o Design passive fire protection, which can be integrated in the architectural design.

o Studies of electrical installations, plumbing and sewer.

o When required, fuel gas study, approved by the PSC or DEPA and gas study.

o Approved active fire protection study by the competent fire service.

o Notarized statement of parking spaces required for the project and the transfer or receipt of payment of the required contribution.

o Affidavit of N.1599 / 86 / engineers who prepared the studies in accordance with para. 6 of Article 2 of N.3212 / 2003. As for the permanent connection of the building with electricity and water networks, is granted by the Environment and Spatial Planning and the documents needed are:

A) Application (available from Service).

B) Correct copy of the building permit in duplicate.

C) Solemn declarations of N.1599 / 86 of the supervising engineers that the house was constructed in accordance with the provisions in the respective study.

D) Documents supervision fee and reservations made for the issuance of the building permit.

E) Technical engineering report.

F) Affidavit of owner, which will be stated that the house was constructed in accordance with the provisions of the respective study.

A family business under the name «Eleloughouses-Wildandfree.gr», which aims to manufacture all kinds of wooden work, the last 26 years.

Contact

Address: Rinteentie 6b66
Rovaniemi, Finland
96100, Finland

Tel: +358505925130
      +358823712033
      +306908663214 (Greece)

We have 5 guests and no members online

Map